Description
The GIS Datasets contain the route and stations of the 93.21km 26″ Lemona – Haro gas pipeline, which starts from the regulation and measurement station in Lemoa, Vizcaya, and ends at the compressor station in Haro, La Rioja.
Table of Descriptions
1 Product Details
2 Files Included
3 Related Upstream/Downstream Pipelines
4 Lifetime Free Updates
5 Scope of Use Terms
1 Product Details
- Product Name: GIS Datasets of Lemona – Haro Gas Pipeline
Nombre del Producto: Conjuntos de Datos GIS del Gasoducto Lemona – Haro - Product Type: GIS Datasets
- Pipeline Length: 93.21km, of which
- Horizontal Distance: 91.34km
- Country: Spain
- From: Lemoa, Vizcaya
- To: Haro, La Rioja
- Coordinate Data: 586 coordinates, including
- 580 Turning Points along the Pipeline Route
- 6 Compressor Station, Regulation and Measurement Stations, Valve Station
- File Formats: KMZ, SHP (Shapefile), XLSX
- Lifetime Updates: Supported
- Language: English
Note: Digital map users who don’t need GIS datasets can choose its vector map edition (click here), which is layered, editable and more economical.
2 Files Included
Two GIS datasets are included in this product based on pipeline facility types. Additionally, some GIS formats do not allow the mixing of different entity types (i.e., points, lines, and areas) within a single file.
2.1 Route of Lemona – Haro Gas Pipeline
The datasets contain a line with the exact location coordinates of 580 turning points along the pipeline route.
2.2 Pipeline Stations of Lemona – Haro Gas Pipeline
The datasets contain the exact location coordinates and names of the pipeline’s 6 compressor station, regulation and measurement stations, valve station.
We provide three types of file formats: .kmz, .shp, and .xlsx. Our users can open .kmz and .shp files with various GIS software and convert them into other GIS formats. You can use Excel to open .xlsx files, which contain the coordinates of pipeline route turning points and stations.
3 Related Upstream/Downstream Pipelines:
We also provide GIS datasets of following direct upstream/downstream pipelines.
Interconnection Pipelines (Bidirectional):
Bermeo – Lemona Gas Pipeline
Vergara – Arrigorriaga Gas Pipeline (part of Barcelona – Valencia – Vascongadas Gas Pipeline Network)
Villar de Arnedo – Haro Gas Pipeline (part of Barcelona – Valencia – Vascongadas Gas Pipeline Network)
Direct Downstream Pipelines:
Haro – Burgos Gas Pipeline (part of Haro – Burgos – Madrid Gas Pipeline Network)
4 Lifetime Free Updates:
The downloadable files of digital pipeline map are updated irregularly to reflect the relocation of pipeline, construction of new stations, removal of existing stations and changes of administrative areas.
Our users are entitled to lifetime free updates for the digital maps they purchased. To download the latest updated map, visit the product download link via “my account” page of this website.
5 Scope of Use Terms:
ARA Research and Publication holds the intellectual property rights to this map and the associated research products. This product is for internal use within the user’s organization and for citation in academic papers and publications. It is prohibited to copy, sell, disclose to any third party, or distribute this product online or offline.